EN

OGK / E-ON 800 MW NG - CCPP


Teknokon carried out the BOP piping and the installation of the auxiliary systems of the HRSG boilers and the gas and steam turbine systems in the leadership of GE – Gama EPC consortium, at the natural gas cycle plant of the OGK/E-ON group in the Siberian region of Russia.

Client: GAMA-GE Consortium
Location: Surgut / Russia
Status: Completed
 

Detailed Scope Of Works


Structural Steel Erection: 754 tons of structural steel
Equipment Installation: 2 CMI type HRSG and stacks, Power Island, 2 BOP equipment, Compressor station
Piping Erection: 10.000 (1.600 P91, 900 P22/P11) x 2 WDI