OMV 880 MW CCPP
Teknokon carried out the BOP piping and the installation of the auxiliary systems of the HRSG boilers and the gas and steam turbine systems in the leadership of GE – Gama EPC consortium, at the natural gas cycle plant of the OGK/E-ON group in the Siberian region in Russia.
Client: METKA
Location: Samsun / Turkey
Status: Completed
Detailed Scope Of Works
Structural Steel Erection: 1820 tons of steel structure
Equipment Installation: 2 Doosan type HRSG and stacks, 2 Power Islands, BOP equipment
Piping Erection: 12.500 (1.700 P91, 1.200 P22/P11) X 2WDI