EN

OMV 880 MW CCPP


​Teknokon carried out the BOP piping and the installation of the auxiliary systems of the HRSG boilers and the gas and steam turbine systems in the leadership of GE – Gama EPC consortium, at the natural gas cycle plant of the OGK/E-ON group in the Siberian region in Russia.

Client:  METKA
Location: Samsun / Turkey
Status: Completed
 

Detailed Scope Of Works

 
Structural Steel Erection: 1820 tons of steel structure
Equipment Installation: 2 Doosan type HRSG and stacks, 2 Power Islands, BOP equipment
Piping Erection: 12.500 (1.700 P91, 1.200 P22/P11) X 2WDI