ACWA 950 MW CCGT
Teknokon, in the EPC leadership of Samsung company, performed the installation of the boilers of the 950 MW natural gas cycle plant, the BOP piping, and the commissioning operations, which is an investment of ACWA energy group in Kırıkkale.
Client: Samsung C&T
Location: Kırıkkale / Turkey
Status: Completed
Detailed Scope of Works
Structural Steel Erection: 500 tons of HRSG structure
Equipment Installation: 2 x Alstom HRSGs
Piping Erection: 20.000 (5.000 P91 + 3.500 P22/P11 + 11.500 CS) WDI