Teknokon realized as turnkey the air separation plant located in the site of Petkim of Air Liquide. Client: Air Liquide Location: İzmir / Turkey Status: Completed Detailed Scope Of Works Fa ...
Teknokon carried out the BOP piping and the installation of the auxiliary systems of the HRSG boilers and the gas and steam turbine systems in the leadership of GE – Gama EPC consortium, at the natural gas cycle plant ...
Teknokon completed the mechanical installation of the paper manufacturing plant 5 of Modern Karton located in Çorlu. Client: Modern Karton Location: Çorlu/Tekirdağ/Turkey Status: Completed Detailed ...
Teknokon got the title to be the first Turkish contractor to work in Cuba with the sulphuric acid plant project that it realized in Moa city, Cuba. Installation of the process equipment and the piping manufactured in T ...
Teknokon performed the installation of the Gas storage tank and system with a capacity of 65.000 m3 at Iskenderun, Isdemir plants. Client: Erdemir A.Ş. Location: İskenderun / Turkey Status: Completed ...
Teknokon completed the installation and commissioning works of the Starch Dryer unit at the Orhangazi plants of Cargill. Client: Cargill Location: Bursa/Turkey Status: Completed Detailed Scope Of W ...
Teknokon completed, in the EPC leadership of Siemens, the 600 MW natural gas cycle plant boilers and the BOP piping of the unit 2 of Enerjisa complex located in Bandırma. Client: Siemens Location: Bandırma / Turk ...
Piping work of 1.800 tons was performed for process and auxiliary systems in the leadership of Foster TR and Alarko Consortium in the project of process & auxiliary systems of DHP / HDS / SRU in Kırıkkale refinery of T ...
The nickel refinery project realized by Zorlu group jointly with Meta company is one of the most comprehensive and biggest projects in mining in Turkey in recent years. Teknokon served as the main construction and mech ...
Teknokon performed the mechanical installation of the air separation unit of Air Liquide located in Nizhniy Novgorod, Russia. Client: Air Liquide Location: Russia Status: Completed Detailed Scope Of ...
Teknokon performed the manufacturing of the site storage tanks and installation of the entire plant of Corn Wet Mill of Amylum located in Adana Location: Adana / Turkey Client: Amylum / Tate&Lyle Scope: Fab ...
Teknokon, in the EPC leadership of Samsung company, performed the installation of the boilers of the 950 MW natural gas cycle plant, the BOP piping, and the commissioning operations, which is an investment of ACWA ener ...
Teknokon Leach plant is performing the installation of the Ammoniac plants within the scope of the industrial complex of Eti Bakır company located in the Mountain of Mazı in Mardin. Client: Eti Bakır Process Provid ...
Cargill Orhangazi tesislerinde ki Starch Driyer ünitesinin Montajı ve devreye alma işleri Teknokon tarafından tamamlanmıştır. Client: Cargill Location: Bursa/Turkey Status: Completed Detailed Scope ...
Teknokon performed as turnkey the air separation plant 7 supplied by Erenko for Isdemir. Client: Erenco / Isdemir Location: Iskenderun / Turkey Status: Completed Detailed Scope Of Works Civ ...
Teknokon performed as turnkey the air separation plant of Air Liquide company located in Ankara/Polatlı. Project Name: Cryogenic Air Separation Plant Client: Air Liquide Location: Polatlı / Turkey Statu ...
Teknokon, in the EPC leadership of Gama Güç Sistemleri, performed the pre-production of the BOP and Aux. Piping of the 840 MW natural gas cycle plant, the installation of the HRSG boilers, the BOP piping, and the commi ...
Teknokon completed and provided maintenance services for long for the mechanical installation and piping works of the Wet Mill Unit, the pipe bridges and the oil refinery of Cargill in Russia/Efremov. Client: C ...
Teknokon performed and commissioned the acid plant and the smelting plant of Eti Bakır in its Samsun plants with all its mechanical scope. Client: Eti Bakır Process Provider: Outotec Location: Samsun/Turkey Statu ...
Teknokon performed the installation, piping, and commissioning works of the HRSG boilers of the RWE plant located in Denizli. Client: METKA Location: Denizli / Turkey Status: Completed Detailed Scope Of Works ...
Teknokon is continuing the installation, construction, mechanics and E&I of the air separation unit 8 supplied by Linde for Isdemir. Client: Linde Engineering AG Location: Iskenderun/Turkey Status: Complet ...
Teknokon carried out the BOP piping and the installation of the auxiliary systems of the HRSG boilers and the gas and steam turbine systems in the leadership of GE – Gama EPC consortium, at the natural gas cycle plant ...
Teknokon carried out the BOP piping and the installation of the auxiliary systems of the HRSG boilers and the gas and steam turbine systems in the leadership of GE – Gama EPC consortium, at the natural gas cycle plant ...
Teknokon, in the EPC leadership of ZENEN firm, performed all the mechanical scope of the Tereshkova plant, which is an investment of Zorlu Enerji located in Moscow, Russia. Location: Moscow / Russia Status: Complet ...
Teknokon, in the EPC leadership of Cengiz Enerji, performed the installation of the HRSG boilers, BOP piping installations and the commissioning operations of the 800 MW natural gas cycle plant of Cengiz Enerji located ...
Within the scope of the installation of the CCR Isomerization unit and the hydro-treater and CCR unit at the Tüpraş Aliağa refinery, 1.800 tons of process and auxiliary systems piping works were performed in the leader ...
Teknokon completed all the construction, mechanics and commissioning works of the GSIP unit project at the Tüpraş Aliağa refinery. Client: Tüpraş Location: Aliağa / Turkey Status: Completed Detaile ...
Within the scope of the project of conversion of the Ataş refinery to a storage terminal, construction and mechanical works were completed in the leadership of Foster Wheeler. Teknokon performed the pre-production and ...
Teknokon completed as EPC the petroleum filling and storage terminal of PCE Denmark located in Batum, Georgia. The terminal has the capacity of receiving and storing of 70 cum/hour and 10 million tons/year HFO/LFO. ...
Teknokon completed as turnkey, including the commissioning, the project of tanker and train filling-emptying and storage terminal located in the Tüpraş İzmit refinery. Client: Tüpraş Location: İzmit / Turkey ...
Teknokon performed the project of tanker filling and storage plant of Petrol Ofisi located in Trabzon. The project was completed as turnkey, including from project designing to materials procurement, electromechanical ...
Within the scope of the project of the Marmara Ereğlisi Opet terminal, Teknokon performed the procurement and installation of the filling arms, and the piping of the port and the terminal. Client: Opet A.Ş Pr ...
Teknokon performed all tanks, paints and rubber coating of the gold mine sulfide expansion project brought into action by Anagold firm with Amec Foster Wheeler Process Design in İliç town in Erzincan. Client: GAP P ...
Teknokon performed all tanks, equipment, piping, insulation and commissioning of the gold mine sulfide expansion project brought into action by Anagold firm with Amec Foster Wheeler Process Design in İliç town in Erzin ...