BP / ATAŞ REFINERY / TERMINAL CONVERSION PROJECT


Within the scope of the project of conversion of the Ataş refinery to a storage terminal, construction and mechanical works were completed in the leadership of Foster Wheeler. Teknokon performed the pre-production and installation of 1.200 tons of pipes within this project.
 
Client: BP Ataş
Process Provider: Mersin / Turkey
Location: Completed in 2007
 

Detailed Scope Of Works

 
Civil Works: "Pipe sleepers, culverts&sleeves, 200 tons of piperacks oil movement control room, electrical substation"
Equipment İnstallation: Transfer pumps, oil collector manifolds
Piping Erection: 1100 tons of CS pipes, 100 tons of supports