CENGIZ ENERGY 800 MW CCPP


Teknokon, in the EPC leadership of Cengiz Enerji, performed the installation of the HRSG boilers, BOP piping installations and the commissioning operations of the 800 MW natural gas cycle plant of Cengiz Enerji located in Samsun.

Client: Cengiz Enerji
Location: Samsun / Turkey
Status: Completed
Num.of Personnel in Peak: 250
Man Hour Spent: 300.000
 

Detailed Scope Of Works


Structural Steel Erection: 8.000 tons of HRSG structural steel and casing
Equipment Installation: DOOSAN - C section HRSG, IP&LP steam drums, 70m main stack
Piping Erection: 30.000 ( 3.500 P91, 1.500 P22/P11) WDI
E&I: 3000 m tubing