ÇÖPLER SULFIDE EXPANSION LEACH PLANT SMP2 PROJECT
Teknokon performed all tanks, equipment, piping, insulation and commissioning of the gold mine sulfide expansion project brought into action by Anagold firm with Amec Foster Wheeler Process Design in İliç town in Erzincan.
Müşteri: GAP
Süreç Sağlayıcı: Outotec - Weir Minerals – Carpentezia Corsi S.R.L. Lime Systems
Konum: Erzincan/Turkey
Durum: Completed
Detailed Scope of Works
İmal Etme: Reactors , CS tanks ,SS tanks, Super dublex tanks, Air receiver, tanks ,Mixing tanks, Bins
Yapısal Çelik Montajı: Platforms ,walkways ,handrails
Ekipman Montajı: Site Erection of Reactors , CS tanks ,SS tanks, Super Dublex Tanks, Bins, 2500 tons equipment installation
Boru Montajı: 50.000 WDI pipe erection
Yalıtım: Insulation of all piping, tanks and equipment