EN

GAMA 840 MW CCPP


Teknokon, in the EPC leadership of Gama Güç Sistemleri, performed the pre-production of the BOP and Aux. Piping of the 840 MW natural gas cycle plant, the installation of the HRSG boilers, the BOP piping, and the commissioning operations, which is an investment of the Gama group in Kırıkkale.

Project Name: 840 MW CCPP
Client: GAMA
Location: Kırıkkale / Turkey
Status: Completed

Detailed Scope of Works


Fabrication: 48.000(4.000 P91, 2.600 P22/P11) WDI BOP Piping
Structural Steel Erection:  8690 tons of HRSG structures
Equipment Installation: 2 x 4346 tons HRSG
Piping Erection:  13.500 (1.300 P91, 1.200 P22/P11) x 2 WDI