RWE 775 MW NG - CCPP
Teknokon performed the installation, piping, and commissioning works of the HRSG boilers of the RWE plant located in Denizli.
Client: METKA
Location: Denizli / Turkey
Status: Completed
Detailed Scope Of Works
Equipment Installation: 2 NEM type HRSG and stacks
Piping Erection: 12.500 (1.700 P91, 1.200 P22/P11) x 2 WDI