TÜPRAŞ CCR IZOMETRIZATION UNITES, HYDROTREATER AND CCR


Within the scope of the installation of the CCR Isomerization unit and the hydro-treater and CCR unit at the Tüpraş Aliağa refinery, 1.800 tons of process and auxiliary systems piping works were performed in the leadership of Foster Wheeler/Gama consortium.

Client: Tüpraş
Location: Aliağa / Turkey
Status: Completed


Detailed Scope Of Works 


Civil Works: Underground pipe, oily water collection, rain water collection and fire fighting systems, 12000 m3 excavation and backfilling, 3000 m3 concrete foundations
Structural Steel Erection: 980 tons of structural steel
Equipment İnstallation: 1000 tons of Process equipment, horizontal and vertical drums, tanks, heat exchangers, columns, air coolers, heating furnace, pumps, compressors
Piping Erection: 6100 metres of piping